Fix/openstack connection creation #1437
integration_test.yaml
on: pull_request
Integration test with juju 3.1
/
Plan
4s
openstack interface test using private-endpoint
/
Plan
11s
Matrix: Integration test with juju 3.1 / build
Matrix: openstack interface test using private-endpoint / build
Matrix: Integration test with juju 3.1 / Integration tests / Integration tests
Integration test with juju 3.1
/
Plan Image Scanning
8s
Matrix: openstack interface test using private-endpoint / Integration tests / Integration tests
openstack interface test using private-endpoint
/
Plan Image Scanning
4s
Integration test with juju 3.1
/
Required Integration Test Status Checks
0s
Matrix: Integration test with juju 3.1 / scan
openstack interface test using private-endpoint
/
Required Integration Test Status Checks
0s
Matrix: openstack interface test using private-endpoint / scan
Matrix: Integration test using private-endpoint / build
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
Integration test using private-endpoint
/
Plan Image Scanning
6s
Integration test using private-endpoint
/
Required Integration Test Status Checks
0s
Matrix: Integration test using private-endpoint / scan
Annotations
1 error and 3 warnings
Integration test with juju 3.1 / Integration tests / Integration tests (test_debug_ssh)
The action 'Setup tmate session' has timed out after 5 minutes.
|
openstack interface test using private-endpoint / Integration tests / Integration tests (test_runner_manager_openstack)
Docker build failed with exit code 1, back off 1.484 seconds before retry.
|
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_failure)
Docker build failed with exit code 1, back off 8.163 seconds before retry.
|
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_failure)
Docker build failed with exit code 1, back off 3.604 seconds before retry.
|